Business Continuity & Disaster Recovery Plan

What happens when something goes very wrong.

Version history: v1.0 — 25 October 2026 (initial publication). v1.1 — 25 October 2026 (audit fixes). See /legal/CHANGELOG.md.

This Business Continuity Plan (“BCP”) and Disaster Recovery Plan (“DRP”) describes how DigiSurvey remains available, and how we restore service after a disruption. It covers Recovery Time Objective (RTO) and Recovery Point Objective (RPO), the backup strategy, the planned secondary region, succession of control, the scenarios we have thought through, how often we test, and how we communicate during an incident.

This page is written for insurer InfoSec questionnaires and for your own records. If a specific insurer MSA requires us to attach it as a schedule, we will.

1. Scope

2. Objectives: RTO & RPO

Function tierExamplesRTO (Recovery Time)RPO (Recovery Point)
Critical Login, survey creation, survey retrieval, insurer sync, authentication 4 hours 24 hours (last successful daily backup)
Secondary Reporting dashboards, analytics, bulk exports, marketing site, Knowledge Hub 24 hours 24 hours
Internal Admin tooling, support ticket back-office, finance tools 72 hours 24 hours

Where live replica (Clause 4) is in place, effective RPO improves toward near-zero. The 24-hour RPO is the worst-case contractual commitment, not the typical performance.

3. Backup strategy

4. Secondary region & infrastructure resilience

5. Succession & access to recovery keys

DigiSurvey is a two-Director company. Both Directors are empowered to execute a restore on their own.

6. Scenarios covered

ScenarioFirst responsePrimary mitigation
Cloud provider outage (Supabase ap-south-1, Cloudflare, Backblaze) On-call confirms the upstream status page, posts to our status page (when live), notifies insurer customers via email per Clause 8. Degrade gracefully; wait for upstream recovery for RTO-bounded outages; when the replica is live (Q2 2027), fail over.
Data corruption (bad migration, bug, bulk delete) Freeze writes to the affected tables; take an immediate point-in-time snapshot before the restore starts. Point-in-time restore from Supabase daily backup; selective restore of affected rows from the GPG-encrypted dump on Backblaze.
Ransomware / malicious encryption Isolate affected systems; preserve forensic image; convene incident response per Breach Notification SOP. Rebuild from the most recent clean, encrypted Backblaze backup (Object-Lock immutability means the ransomware cannot have overwritten it). CERT-In 6-hour filing where applicable.
Physical disaster at HQ (fire, flood, loss of office premises) Operations relocate to home-working; cloud operations are unaffected because nothing production-critical lives on an HQ server. Shift support channels to on-call cellular; secondary postal address for grievance notifications in writing — served copy may be sent to legal@digitaliiisla.co.in as alternative, as noted in Audit Readiness.
Key personnel incapacitation (one or both Directors) The remaining Director assumes all operational authority; if both are incapacitated, Clause 5 succession applies. Each Director holds an independent key envelope (Clause 5). No single person is a critical dependency.
Sub-processor failure (payment gateway down, OCR provider down, email provider down) Communicate degraded functionality; disable the affected feature in the UI rather than crash. Documented fallbacks: alternative payment capture for the subscription (invoice/UPI), queued OCR, delayed transactional email.
Nationwide regulatory outage (e.g. a CERT-In mandated takedown, judicial order) Comply with the order; document the scope; notify affected customers of the specific functionality constrained. Scope compliance narrowly as the order permits; legal counsel engaged within hours.

7. Testing & exercises

8. Communications during an incident

9. Insurance

10. Review & ownership

Business Continuity Commitment · signed

Digitaliiisla Technologies Private Limited commits to the RTO, RPO, backup regime, succession arrangements, exercise cadence, and incident communications described in this plan. Where a commitment is marked Planned, we commit to delivering it on the stated timeline and to notifying customers of material slippage. Where a commitment is marked Live, we commit that it is in place today, and that we will produce evidence to insurer customers on request under NDA.

Signature of Mrs. Monika Sharma
Mrs. Monika Sharma
Director · Authorised Signatory
Signature of Mr. Vikas Saini
Mr. Vikas Saini
Director & Founder

Dated: 25 October 2026 · Jhunjhunu, Rajasthan, India

Witnessed by Grievance Officer. Mr. Alok Sharma, Advocate — Grievance Officer; Bar Council of Rajasthan, Enrolment No. R/1387/2012 · grievance@digitaliiisla.co.in · +91 93145 91361

CIN U62011RJ2026PTC119030 · Registered office: Khemi Sati Road, Jhunjhunu, Rajasthan – 333001 · legal@digitaliiisla.co.in